Installation Manual

Table Of Contents
14
Installation Instructions G5 Release A
Assembling the Control Pod and Carrier
Follow the procedure below to assemble the Control Pod and Carrier to form a fully functional headset:
1.
On the opposite side of the Headset Carrier, ensure that the Control Pod Locking Mechanism is in the
unlocked position by sliding it all the way to the left. A small flat head screwdriver or other similar tool can
be used to slide the locking mechanism if needed. See Figure 9 below.
2.
Align Charging Contact Block on Control Pod into the Charging Contact Block Receptacle of the Head-
set Carrier. Once the Charging Contact Block is set into in the Receptacle it will act as hinge or pivot
point. See Figure 10.
3.
Gently press the two halves together until they securely snap into place at the top. You may need to apply
a slight downward pressure to align the connections appropriately. When the Control pod is connected to
Carrier you will hear a slight click sound. See Figure 10.
4.
Slide locking mechanism on opposite side of carrier to the locked position. See Figure 9.
5.
Insert battery into the now assembled headset. See Figure 11.
6.
LED indicator lights on the Headset should start blinking (refer to component Identification and Descrip-
tion section below). The headset is now ready for registration to a basestation.
Figure 9.
Figure 10.