Installation Instructions

6
Sequential Operation
The sequential operating kit prevents succesive or "bounce"
driving.
Depress the work contacting element and hold it against the
work surface before pulling the trigger.
After each fastener is driven, completely release the trigger
and lift the tool from the work surface.
Precision Placement Driving
Grasp the tool handle firmly and place the bottom of the work
contacting element firmly against the workpiece until it is com-
pletely depressed.
Squeeze the trigger to drive the fastener.
Lift the tool from the workpiece.
Repeat the procedure for the next fastener.
Successive (Bounce) Driving
Grasp the handle firmly.
Squeeze the trigger and move the tool along the workpiece
with a bouncing motion, depressing the work contacting element
at the points where you want to insert a fastener.
Keep the trigger depressed and continue to bounce the work
contacing element against the workpiece, positioning the tool
above as carefully as possible.
When the desired number of fasteners have been driven,
release the tool trigger to avoid unintentional fastener discharge.
TOOL OPERATION -
continued
Loading of Nails
Step 1 - Grasp the handle firmly.
Step 2 - Insert one strip of nails into the
rear of the magazine.
Step 3 - Pull the follower to the rear of the
magazine until it is engaged behind
the nails.
Switching the Trigger
The tool is manufactured with a trigger that
can be switched from sequential operation to a
bounce drive operation. The trigger is placed in
the sequential operating position when the tool
was manufactured. To switch the trigger to the
bounce operating position, remove the O-ring
and trigger pivot pin from the trigger assembly.
Move the trigger to the bounce operation position
and install the trigger pivot pin and O-ring. The
postion indicator on the tool should now be
pointing to the as shown in the illustration.
Bounce drive
position
Position
indicator
Pivot pin
and o-ring
Sequential
drive position