ASSEMBLY INSTRUCTIONS METAL GARDEN SHED SKU: T-PS22-0096 BE YOUR LIFE BUILDER www.patiowell.com Metal Garden House Installation Tutorial https://patiowell.com/pages/ video-t-ps22-0096-8 saleservice@patiowell.
SITE PREPARATION Level the ground surface. ent cem Recommendation: Construct a wooden or concrete base as a foundation. The external dimensions of the product : 80.2’’ 118’’ 120.
BEFORE STARTING ASSEMBLY Remove all of the pieces from the 4 packages and spread them out on the ground. Before installation, please check the type and quantity of parts first. It is recommended to use a clean work surface to spread the parts out and for pre-assembly steps. Review all instructions before you begin, continue to refer to instructions during assembly. Be sure to follow all steps thoroughly. Please prepare these components in advance at the beginning of each stage.
FOUNDATION 1 X2 2 X2 BS1L X1 BS1 X1 BS2L X1 BS2 X1 PLATES P1 X2 W1A X22 WS2A X4 P2 X2 P3 X4 P3A X4 21L X2 21R X2 P4 X2 04 P5 X2
PLATES DLA X1 DLB X1 DRA X1 STRIPS DX2 X4 UL1 X1 UR1 X1 7 X1 8 X1 9 X4 10L X1 10R X1 05 DRB X1
STRIPS 13 X4 14 X4 15 X2 16 X2 17 X2 18 X2 19 X2 20 X4 B1 X4 B2 X2 B3 X2 06 GS X2
STANDARD DG X1 DF X1 DC X2 DH X4 C2 X4 GF X4 GR X2 GE X2 GC X4 S1 X120 V2 X418 SCREW cm 1 inch 2 0.5 3 1 1 inch M4*10 2 0.5 3 1 cm For GC inch 1 0.5 F5(X4) cm 4 inch 3 1 0.5 1 3 1 0.5 4 1.5 M4*16 07 4 1.5 M4*10 2 F4(X5) M5*12 2 2 F2(X54) 1.5 F3(X32) 1 inch 1.5 F1(X503) cm cm 4 3 1 4 1.
GC 15 GE P1 P3 16 P3 GC 17 P3A P2 19 P4 P3A 18 P5 P5 P3A 19 18 P3 P4 P3A P2 17 GC P3 16 P1 GE 15 GC 21L GF 21R GF 13 B3 B1 B1 B2 13 14 14 14 14 13 GF 13 B2 GF B1 B1 B3 21R 21L C2 9 10R GS GR 10L 9 C2 C2 9 8 GS GR 7 9 C2 WS2A W1A W1A W1A W1A W1A W1A W1A W1A W1A W1A W1A W1A W1A WS2A 20 W1A DRA DLB DLA W1A DH W1A W1A WS2A W1A DL1 DX2 DX2 DG DF W1A UR1 DRB DC W1A W1A WS2A DH 20 W1A DH DX2 DC DX2 20 DH 20 BS2L 2 BS2
CONTENTS Bottom frame 10-12 (page) Wall 12-20 (page) Roof 21-30 (page) Door 31-36 (page) 09
ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.
STEP 2 F1 BS2 BS2 BS2L BS2L BS2 BS2L F1 X2 STEP 3 F1 2 2 BS2L BS2L A A 2 BS2L 1 F1 BS2 1 A A A 2 BS1 1 BS1L 2 A 11 F1 X12
STEP 4 F1 x4 F1 X4 STEP 5 Tips: Align the gasket with the hole, and then use the electric drill to drill the V2 into the hole.
STEP 6 WS2A WS2A WS2A BS1 WS2A WS2A BS1L V2 F1 x4 F1 X16 V2 X16 STEP 7 W1A W1A W1A W1A F1 W1A BS1 V2 x4 BS1L 13 F1 X16 V2 X16
ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.
STEP 9 × √ Note: Connector must fit. STEP 10 9 9 F1 9 V2 x4 9 9 The hole position on No. 9 pole is replaced by slot.
STEP 11 10R GS 10R 10L 10L 10R F1 10L F1 X4 STEP 12 1 10R Insert into two square tubes 10L C2 9 10L 2 BS1 V2 10L F1 W1A x2 BS1L 16 F1 X6 V2 X6
STEP 13 8 GS 7 8 7 e outer sid 7 de the other si F1 8 F1 X4 STEP 14 Insert into two square tubes 1 9 7 W1A C2 W1 8 V2 7 7 F1 V2 F1 2 BS1 x2 BS1L 17 F1 X6 V2 X6
ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step3 STEP 15 W1A W1A W1A W1A BS1L BS1 W1A W1A W1A V2 F1 In order to facilitate the positioning, it is recommended that the screws at the bottom be driven first.
STEP 16 W1A W1A W1A W1A W1A W1A F1 W1A V2 W1A W1A W1A W1A V2 F1 V2 BS1 F1 BS1L F1 X40 V2 X40 F1 X48 V2 X48 STEP 17 V2 F1 BS1 W1A W1A W1A W1A W1A W1A 19
STEP 18 BS1L BS1 W1A W1A BS1 BS1L V2 F1 X12 V2 X12 F1 STEP 19 A B V2 A UR1 F1 V2 W1A UL1 F1 B UR1 UL1 UR1 BS1 A BS1L B In UL1 V2 F1 F1 ti ip: t n io lat l sta n lt i V2 Tips: Insert UL1 and UR1 between the top beam and bottom frame respectively, and then push them to the corresponding position.
ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. F1 V2 https://www.patiowell.
STEP 21 21L Four screws in the middle can be installed first to facilitate fixation.
1 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. 21R https://www.patiowell.com/pages/ video-t-ps22-0096-8?step5 STEP 22 13 14 14 13 Note: 14 is pressed into 13.
STEP 23 Don't tighten these two screws too tightly. 75.7 13 14 M2 0° F2 14 13 14 13 M2L Don't tighten these two screws too tightly.
STEP 25 14 14 F2 13 F2 13 x2 F2 X8 STEP 26 F2 14 14 B2 14 13 13 13 13 14 F2 13 B3 14 Tighten all screws.
ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step6 P3 P3A F1STEP 27 V2 P2 P1 P3 P3A P3 Note: Do not install F1 and V2 in P3the holes near the outer side of P1,P2. P5 all P4 sm P3A P1 P3 Short distance from the edge at the top.
3 STEP 28 all sm P1 P3 P3A A P4 P4 AA P5 Big B B P2 F1 X57 V2 X57 STEP 29 19 F1 V2 19 27 F1 X1 V2 X1
STEP 30 F1 V2 19 19 F1 X2 V2 X2 STEP 31 Installation tips : You need to gently lift the 19 and then screw it.
ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step7 STEP 32 16 F1 15 F1 V2 V2 15 16 Note: Do not install F1 and V2 in the holes near the outer side of P1,P2.
STEP 33 16 GE 15 15 x2 16 F1 X6 V2 X6 STEP 34 B F1 A F1 18 V2 V2 B 18 17 17 x2 B GC A GC A 17 F5 F1 B V2 18 GC 18 GC B 30 F1 X6 V2 X6 x4 F5 X4
ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.
STEP 36 DLB DLA DRB DRA F2 DLB DLA x2 DRB DRA F2 X2 STEP 37 20 DLB DLA 20 DRB F1 DRA DLB 20 DLA F1 DRB 20 DRA 32 x2 F1 X4
STEP 38 20 20 F1 DLB DH DLA DLB DX2 inside DLA DH F3 F1 X2 DX2 DH 20 F1 20 F1 X4 F3 X8 STEP 39 20 F1 20 DRB DH DRA DRB DX2 inside DRA DH F1 F3 X2 DX2 DH 20 F1 20 33 F1 X4 F3 X8
STEP 40 DC DLB DLA F1 DC 34 F1 X8
STEP 41 V2 F1 outside DLB DLA DF F4 F1 X8 V2 X8 F4 X2 STEP 42 V2 F1 DRB DG DRA outside ou DG F4 35 F1 X8 V2 X8 F4 X3
ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.
STEP 44 F1 S1 37 S1 X120
CARE & SAFETY • In case of fire, do not attempt to extinguish any burning polypropylene with water Unsuitable for storage of flammable or corrosive substances. • It is of utmost importance to assemble all of the parts according to the directions. Do not skip any step. • Please consult your local authorities if any permits are required to erect shed. • Periodically check shed to assure that it remains stable and that the site remains level.