ASSEMBLY INSTRUCTIONS METAL GARDEN SHED SKU: T-PS23-0355A BE YOUR LIFE BUILDER www.patiowell.com Metal Garden House Installation Tutorial https://www.patiowell.com/ pages/video-t-ps23-0355a saleservice@patiowell.
SITE PREPARATION Level the ground surface. ent cem Recommendation: Construct a wooden or concrete base as a foundation. The external dimensions of the product : 76.4’’ 120.3’’ 93.
BEFORE STARTING ASSEMBLY Remove all of the pieces from the 3 packages and spread them out on the ground. Before installation, please check the type and quantity of parts first. It is recommended to use a clean work surface to spread the parts out and for pre-assembly steps. Review all instructions before you begin, continue to refer to instructions during assembly. Be sure to follow all steps thoroughly. Please prepare these components in advance at the beginning of each stage.
FOUNDATION 1 X2 2 X2 BE1L X1 BE1 X1 BE2L X1 BE2 X1 PLATES PE3 X4 W1A X18 WS2A X4 PE4 X4 WS3A X2 PE5 X2 PE6 X2 P4 X2 04
PLATES P5 X2 A3 X2 A4 X2 DLA X1 DRA X1 05
STRIPS DX2 X4 ULA X1 UR1 X1 7 X1 8 X1 9 X4 10L X1 10R X1 13 X4 14 X4 M9 X2 M10 X2 06
STRIPS 17 X2 18 X2 19 X2 20 X4 C4L X2 C5 X4 C4R X2 STANDARD DG X1 DF X1 DC X2 DH X4 C2 X4 GF X4 GR X2 GE X2 GS X2 GC X4 S1 X104 V2 X418 07
SCREW cm 1 in ch 3 2 0.5 1 1 in ch M4*10 2 0.5 3 1 cm For GC in ch 1 0.5 F5(X4) cm 4 in ch 3 1 0.5 1 3 1 0.5 4 1.5 M4*16 08 4 1.5 M4*10 2 F4(X5) M5*12 2 2 F2(X54) 1.5 F3(X32) 1 in ch 1.5 F1(X487) cm cm 4 3 1 4 1.
GC M9 GE PE5 PE4 M10 17 PE6 PE3 19 PE4 GC P4 P5 PE3 18 P5 18 PE3 19 P4 PE4 GF A4 GE PE5 C4L C5 C5 M10 PE4 17 A3 GF M9 13 C4R 13 GC 14 14 14 14 13 C4R 13 C5 GF GF A3 WS2A A4 C5 C4L W1A W1A W1A W1A W1A W1A W1A C2 W1A 10R W1A GS 9 W1A GR 10L WS2A GC PE6 PE3 W1A 9 C2 C2 9 8 GR W1A 9 7 W1A 20 GS C2 W1A DC W1A DH W1A DX2 DF DX2 DLA W1A WS3A W1A WS2A ULA WS2A WS3A UR1 DRA DX2 20 DH DG DH DX2 20 DC DH 20 BE2L 2 BE2
STEP 1 F1 BE1 BE1 BE1L BE1 BE1L F1 X2 STEP 2 F1 BE2 BE2 BE2L BE2 BE2L 10 F1 X2
STEP 3 F1 2 2 BE2L BE2L A A 2 BE2L F1 BE2 1 1 2 A A BE1 1 BE1L 2 t on Fr F1 X12 A STEP 4 F1 x4 11 F1 X4
STEP 5 WS2A WS2A WS2A BE1 WS2A BE1L t on Fr x4 F1 X16 V2 X16 STEP 6 W1A W1A W1A W1A BE1 W1A F1 V2 BE1L x4 12 t on r F F1 X16 V2 X16
STEP 7 10R 10R GS GS are qu os tw to t in r e Ins 10R 10L 10L 10R r erio int 10L 10L es tub F1 F1 V2 10L x2 W1A Insert into two square tubes 10L t C2 on Fr x2 BE1 BE1L F1 X10 V2 X6 STEP 8 8 GS 7 8 7 positive 7 F1 8 13 e the other sid F1 X4
STEP 9 Insert into two square tubes 7 C2 x2 8 7 V2 F1 7 x2 BE1 t ron F BE1L F1 X6 V2 X6 STEP 10 9 9 Ins ert int ot wo squ are tub es 9 GR 9 9 x2 9 9 9 9 F1 Insert into two square tubes 9 BE1 7 BE1L C2 x4 14 V2 x4 t on Fr F1 X20 V2 X20
STEP 11 W1A W1A W1A W1A W1A V2 F1 W1A W1A W1A W1A BE1 W1A t BE1L on r F F1 X80 V2 X80 STEP 12 W1A W1A W1A W1A W1A F1 W1A V2 W1A W1A Be hin d 15 F1 X32 V2 X32
STEP 13 WS3A V2 F1 WS3A Fr on t F1 X8 V2 X8 STEP 14 V2 UR1 ULA V2 WS3A UR1 UR1 F1 V2 ULA F1 ULA V2 F1 t on Fr 16 F1 X8 V2 X4 F1
STEP 15 F2 A3 V2 A4 C4L C5 F2 C4R x2 F2 x2 GF GF F2 X20 V2 X16 STEP 16 13 14 14 Note: 14 is pressed into 13 17 13
STEP 17 Don't tighten these two screws too tightly 75 .
STEP 19 F1 V2 A4 A3 F1 V2 A3 A4 Fr on t F1 X24 V2 X24 STEP 20 Tighten all screws 14 13 F2 F2 14 B2 14 14 13 13 13 14 F2 13 B3 14 Fr 13 on t 19 F2 X12
STEP 21 P4 F1 V2 PE5 PE4 P5 PE3 all sm PE6 PE4 PE3 P4 PE3 PE4 PE5 P5 P4 A g Bi B Fr on t F1 X147 V2 X147 STEP 22 19 F1 V2 19 20 F1 X1 V2 X1
STEP 23 F1 V2 19 19 Fr on t F1 X2 V2 X2 F1 X33 V2 X33 STEP 24 Installation tips : You need to gently lift the 19 and then screw it.
STEP 25 When installing the hole at the bottom of 19, 19 needs to be moved or lifted M10 M9 F1 V2 M9 M10 Fr on t F1 X8 V2 X8 STEP 26 F1 M10 GE M9 M9 x2 M10 Fr on t 22 F1 X6
STEP 27 F5 18 18 x4 F1 V2 GC GC 17 GC 17 F1 18 V2 18 17 GC Fr x2 on t F1 X6 V2 X6 STEP 28 20 Note: make clear the front and back of the door panel DLA 20 23 F5 X4
STEP 29 V2 F1 outside inside DF F4 F1 F1 X10 V2 X8 F4 X2 STEP 30 F1 DH DX2 DLA F1 F3 DX2 DH F1 X2 24 F1 X4 F3 X8
STEP 31 DC DC DC F1 DC 25 F1 X8
STEP 32 20 DH DX2 DRA F3 X2 DX2 DH 20 26 F1 X4 F3 X8
STEP 33 20 Note: make clear the front and back of the door panel DRA 20 STEP 34 V2 F1 DG inside outside DG F4 F4 F4 F1 27 F1 X10 V2 X8 F4 X3
STEP 35 DRA DLA UR1 F3 DRA X4 28 F3 X16
STEP 36 F1 F1 S1 S1 S1 F2 S1 X 120 FINISH 29
CARE & SAFETY • In case of fire, do not attempt to extinguish any burning polypropylene with water Unsuitable for storage of flammable or corrosive substances. • It is of utmost importance to assemble all of the parts according to the directions. Do not skip any step. • Please consult your local authorities if any permits are required to erect shed. • Periodically check shed to assure that it remains stable and that the site remains level.