Installation Instructions

Page 3 of 5
ASSEMBLY INSTRUCTIONS FOR RAIL SUPPORT
ASSEMBLY INSTRUCTIONS FOR RAIL
1
3
Support
Base
Pipe of rail
support
Ceiling
1. Mark two desired positions
and drill them on the ceiling
for two rail supports on the
side of the canopy(DD).
NOTE: Center the canopy
between two rail supports
and the distance between
each rail support and the
canopy is 14 ~ 18 inches.
So the remainder length
of the rail could be bent to
a wonderful arc.
B
B
14~18 inches
14~18 inches
DD
2
1
4
2
DD
A
B
B
A
EE
EE
FF
EE
2. Attach two anchors(EE) to
the drilled positions.
3. Unscrew the support
bases from the rail
supports(B), then attach
support bases onto the
ceiling by threading
drywall screws(FF) into
the pre-tightened
anchors(EE).
Secure the pipe of rail
supports(B) into the
support bases tightly.
3
3. Attach the rail(A), while
making certain the
ground strip is facing to the
ceiling.
Close the movable part of
the rail support(B) over the
rail(A). Once a good fit is
achieved, re-tighten the
caps back onto the rail
support(B) to secure rail in
place.
4. Unscrew the caps from the
rail adapter(C), and then
turn the movable part of
the rail adapter(C) down.
Attach the rail(A) onto
the slot of the pre-tightened
rail adapter(C).
Note: If the adapter is not
able to close around the
rail, double check that the
brass strips on the rail
and the brass clips on the
rail adapter is aligned
properly.
Close back the movable part of rail adapter(C) over the
rail(A), then restore the caps back to the rail adapter(C).
Make certain that the brass clips of the adapter(C) are
connected properly with the brass strips of the rail(A).
5. Shape the rail as your desired. Then mark and drill the
desired positions on the ceiling for the rest of the rail
supports.
6. Repeat the steps of Rail Supports Installations to locate
the rest rail supports. Then follow steps 2, 3 of Rail
Installations to install the rail onto the others
pre-tightened rail supports.
Brass Strip
Ground Strip
Brass Strip
1. Carefully take out the rail(A)
from the package. Place the
rail(A) as shown in Fig.1.
There has a ground strip
on the top of the rail, and two
other brass strips placed at
the same side of the rail.
2. Unscrew the caps from one
pre-tightened rail supports(B),
then rotate the movable
part of the rail support(B)
down.
Movable part
of Rail Support
Cap
Cap
Movable part
of Rail Support
Point to Ceiling
Cap
Cap
Ground Strip
B
C
A
Brass Clip
Ground Strip
Brass Strip
Ground Clip
A
C