Planning the installation 35
Model 4520 & 4110 Series Getting Started Guide 3 • Hardware installation
Planning the installation
Before you start the actual installation, it is strongly recommended that you gather all the information needed
to install and setup the device. See table 4 for an example of what pre-installment checks you might need to
carry out. Having carried out the pre-installation checks enables you to install and set up your gateway router
into an existing infrastructure with confidence.
Note When setting up your gateway router consider cable length limitations, and
potential electromagnetic interference (EMI) as defined by the applicable
local and international regulations. Ensure that your site is properly prepared
before beginning installation.
Before installing the gateway router device, the following tasks should be completed:
Create a network diagram (see section “Network information on page 37)
Gather IP related information (see section “IP related information on page 37 for more information)
Install the hardware and software needed to configure the SmartNode. (See section “Software tools on
page 37)
Verify power source reliability (see section “Power source on page 37).
When you finish preparing for gateway router installation, go to section “Installing the gateway router” on
page 38 to install the device.
The mains outlet that is utilized to power the equipment must be
within 1 foot (3 meters) of the device and shall be easily accessible.