Installation guide

Installation Instruction
Direct Expansion Fan Coil Units
Sizes 018m071
PF1MNB
NOTE: Read the entire instruction manual be_bre starting the installation.
This symbol -_ indicates a change from the last publication.
SAFETY CONSIDERATIONS
hnproper installation, adjustment, alteration, service, maintenance, or use can cause explosion, fire, electrical shock, or other conditions which may
cause personal injury or property damage. Consult a qualified installer, service agency, or your distributor or branch for information or assistance.
The qualified installer or agency must use _actory-authorized kits or accessories when modifying this product. Refer to the individual instructions
packaged with the kits or accessories when installing.
Follow all safety codes. Wear safety glasses and work gloves. Use quenching cloth for brazing operations. Have fire extinguisher available. Read
these instructions thoroughly and follow all warnings or cautions attached to the unit. Consult local building codes and National Electrical Code
(NEC) for special requirements.
Recognize safety information. This is the safety-alert symbol Z_ When you see this symbol on the unit and in instructions or manuals, be alert
to the potential for personal injury.
Understand the signal word, DANGER, WARNING, and CAUTION. These words are used with the safety-alert symbol. DANGER identifies the
most serious hazards which will result in severe personal il_iury or death. WARNING signifies hazards which could result in personal injury or
death. CAUTION is used to identify unsafe practices which would result in minor personal injury or product and property damage. NOTE is used
to highlight suggestions which will result in enhanced installation, reliability, or operation.
Z_ WARNING: Before installing or servicing unit, always turn off all power to unit. There may be more than '1 disconnect
switch. Turn off accessory heater power if applicable. Electrical shock can cause personal injury or death.
INTRODUCTION
Model PF1MNB Fan Coil Units are designed for flexibility and can be used for upflow, horizontal, or downflow applications.
----) These units are designed to meet the low air leak requirements cun'ently in effect. Because of this, the units need special attention in the condensate
pan and drain connection area and when brazing tubing. These units are available for application in systems of 18,000 through 60,000 Btuh
nominal cooling capacities. (See Fig. 2 and 3.) Factory-authorized, field-installed electric heater packages are available in 3 through 30 kw. See
Product Data for available accessory kits.
--> HEATER PACKAGES
This unit may or may not be equipped with an electric heater package. For units not equipped with _actory installed heat, a _actory-approved, field
installed UL listed heater package is available from your equipment supplier. See unit rating plate lbr a list of factory approved heaters. Heaters
that are not factory approved could cause damage which would not be covered under the equipment wan'anty. If fan coil contains a factory installed
heater package, minimum circuit ampacity (MCA) and maximum fuse/breaker may be different than units with a same size field installed accessory
heater. The difference is not an error and is clue to calculation difference per UL guidelines.
INSTALLATION
---> PROCEDURE I--CHECK EQUIPMENT
Unpack unit and move to final location. Remove carton taking care not to damage unit.
Inspect equipment for damage prior to installation. File claim with shipping company if shipment is damaged or incomplete. Locate unit rating
plate which contains proper installation information. Check rating plate to be sure unit matches job specifications.
PROCEDURE 2--MOUNT UNIT
Unit can stand o1" lie on floor, or hang from ceiling o1"walh Allow space for wiring, piping, and selwicing unit.
IMPORTANT: When unit is installed over a finished ceiling and/or living area, building codes may require a field-supplied secondary condensate
pan to be installed under entire unit. Some localities may allow as an alternative, the running of a separate, secondary condensate line. Consult
local codes for additional restrictions or precantions.
A. Upflow Installation
If return air is to be ducted through a floor, set unit on floor over opening and use 1/8- to 1/4-m. thick fireproof resilient gasket between duct,
unit, and floor.
Side return is a field option on slope coil models. Cut opening per dimensions. (See Fig. 1.) A field-supplied bottom closure is required.
Form: IM-PF1M-04 Cancels: IM-PF1M-03 Printed in U.S.A. 1-03 Catalog No. 53PF-1M5