Installation Guide

peakaluminumrailing.com
Tools & Materials Needed
All fasteners are included with each component.
• Hacksaw or metal cutting saw
• Drill
• Drill bits: 1/8", 1/4", 5/32", 7/32"
• 3/8" socket or wrench
• Phillips screwdriver
• Measuring tape
• Non-corrosive exterior silicone caulking
Lag bolt
Connector
Bolt
Phillips screw
Self-drilling screw
See WARNING on inside panel
GATE INSTALLATION
Latch
Retainer
Latch plate
Gate frame
Use self-drilling screws for these steps:
- Secure the retainer to the gate frame at
marked position.
- Insert the latch through the retainer and
secure to the gate frame at marked position.
- Secure the latch side of the gate frame to
the top and bottom gate rails.
- Secure the latch plate.
Gate opening (W), must not exceed 46".
Remove the latch side of the gate (Fig. 1). Cut the top
and bottom gate rails 7 1/2" shorter than the gate
opening (Fig. 2). Align the top rail of the gate with the
handrails. Drill 5/32" pilot holes into the post and lag bolt
the gate to the post.
W ( max)46"
W minus 7 1/2"
(Fig. 2)
(Fig. 1)
12
PK_AR_ii_V2
Installation GuideInstallation Guide
U.S. VersionU.S. Version