User Manual

CAUTION!
Removing the backcover and replacement of the fuses must
only be performed by qualified personnel.
Follow these steps to replace the fuse:
1. Turn off the meter and disconnect the test leads.
2. Remove the cover by unscrewing the 4 screws and pulling
off the meter’s cover.
3. Remove the PCB by unscrewing one screw.
4. Install the new fuse in the fuse compartment.
5. Replace the PCB and secure it with the screw.
6. Replace the cover and secure it with the screws.
All rights, also for translation, reprinting and copy of this manual
or parts are reserved.
Reproduction of all kinds (photocopy, microfilm or other) only by
written permission of the publisher.
This manual considers the latest technical knowing. Technical
alterations reserved.
We herewith confirm, that the units are calibrated by the factory
according to the specifications as per the technical
specifications.
We recommend to calibrate the unit again, after 1 year.
© PeakTech
®
05/2014/Pt/Th.
PeakTech Prüf- und Messtechnik GmbH - Kornkamp 32
DE-22926 Ahrensburg / Germany
+49-(0) 4102-42343/44 +49-(0) 4102-434 16
info@peaktech.de www.peaktech.de