User Manual

3.2. Operating method
1.) First connecting the load to the power supply. After the unit is switched on, output voltage
and current will be indicated by LED
2.) Turning the output voltage adjustment to adjust the voltage
3.) Using the AC or DC switch to choose the AC or DC
4.) Pressing on the smoothing switch to get the smoothed DC.
NOTE:
When DC is smoothed, the voltage will be higher than the voltmeter’s value.
CAUTION!
When operating is finished, put it in a dry place of good ventilation, and keep it clean. If it is not in
use for a long period, pull off the power supply plug for storage. For maintenance, input voltage
must be cut off.
If a load of more than 5 A AC/DC connected to the corresponding output of PeakTech
®
6120, the
thermal overload protection will trip and thus switches off the output.
A resetting of the overload protection is possible if the maximum output current is not exceeded.
All rights, also for translation, reprinting and copy of this manual or parts are reserved.
Reproductions of all kinds (photocopy, microfilm or other) only by written permission of the
publisher.
This manual is according the latest technical knowing. Technical changings which are in the
interest of progress, reserved.
We herewith confirm that the units are calibrated by the factory according to the specifications as
per the technical specifications.
We recommend to calibrate the unit again, after 1 year.
© PeakTech
®
03/2013 Pt/Th.
PeakTech Prüf- und Messtechnik GmbH - Kornkamp 32 - DE-22926 Ahrensburg / Germany
+49-(0) 4102-42343/44
+49-(0) 4102-434 16
info@peaktech.de
www.peaktech.de