Assembly

Mitered Hanger Rail
The arrows point out the
1 1/2" projection on the back
of the mantel.
This is where the mantel
will touch the wall first.
Easy 3 Piece Assembly:
Legs bolt to Header
Scribe Moulding
Scribe Moulding
Projection
This opening gap between
the back of the mantel leg
and the wall is called
“the projection”
Front of
Mantel Leg
Hides any gaps between
the front of the mantel and
the material behind it.
Hanger Board
Attaches to Wall
Mounting hardware for hanger rail and scribe moldings not included.
Wood and MDF mantels are considered combustible materials. Heat clearances must be adhered to. Before installing,
check your local building codes and the manufacturer's instructions for your specic replace insert or stove.

Summary of content (1 pages)