Installation Manual

4 of 24
ISSUED: 08-09-10 SHEET #: 061-9059-5 07-08-15
Thread two bolts (M) through four washers (N),
ceiling clamp (L), ceiling assembly (C), and two
locknuts (O) as shown.
Repeat for second ceiling clamp.
Lift ceiling assembly (C) up to I-beam and slide
ceiling clamps (L) as close to the center of the
I-beam as possible. NOTE: Tube of ceiling
assembly should be centered below I-beam.
Alternate between tightening bolts (M) of right
clamp and left clamp until bolts evenly apply force
to each clamp.
Thread four hex nuts (P) onto four bolts (M).
Thread four bolts (M) into side of ceiling assembly
(C), but do not tighten.
1
3
2
Installation to I-beam
Installer must verify that the supporting beam will safely support the combined weight of all attached equipment and
hardware.
WARNING
N
N
M
P
M
C
L
C
O
M
M
C
I-BEAM
LEFT CLAMP (L)
RIGHT CLAMP (L)
TUBE
Tighten bolts (M) on sides of ceiling plate
assembly just until they touch the ceiling clamp.
Tighten hex nuts (P) until they touch the sides of
ceiling plate assembly.
4
M
P