Instructions / Assembly

Stair Rail Assembly
With protecve blanket or cardboard sll in place, lay top
rail down with cut-outs facing up.
Install balusters into cut-outs using rubber mallet if
needed.
Install boom rail with cut-outs facing down, line up each
baluster and tap boom rail with rubber mallet unl fully
compressed.
Rack rail to an angle (can be adjusted in nal steps). (2a)
Peel back ends of protecve wrap, do not remove.
Fit Upper brackets on Top and Boom rail with u-brackets
facing up. (2b)
Peel back ends of protecve wrap, do not remove.
Fit Lower brackets on Top and Boom rail with u-brackets
facing down. (2c)
Stair Rail Insllaon
With railing racked, stage between top and boom stair
post, use clamps to secure rail to post with u-bracket or
baluster (2d). At this me, make sure spacing is 36” (for
residenal) from nose of stair tread to top of top rail, and
42” for commercial. Also take this me to adjust angle.
Install u-bracket to post with #8 x 1 1/4” #2 self tapping
screws, (right angle driver may be needed for ght areas).
(2e)
With #8 x 3/4 self taping screws install brackets, (right an-
gle driver may be needed for ght areas). (2f)
Remove the protecve lm from the top of the top rail.
Cung Stair Rail
Lay down a protecve blanket or cardboard and place
boom rail and top rail next to each other lining up cut
outs.
Use rail marks from 1c and use a speed square to transfer
marks to top rail. Use a pencil to clearly mark “T” for Top
and “B” for Boom rail and a “U” for Upper and “L” for
Lower ends of rail, for reference.
From the Upper mark of Boom rail deduct 2 1/2-
Lower mark of Boom rail deduct 1 1/2.
From the Upper mark of Top rail deduct 2 1/2- Lower
mark of Boom rail deduct 1
Use chop saw and cut rails according to marks.
2a
2b
2c
2d
2d
2e
2f