Installation Guide
Pegatha Aluminum Railing
Level Rail Installaon Instrucons 2015 V1.0
Step #1 – Aluminum Post Installaon
Determine locaon of all posts prior to installing deck
boards.
Add blocking where necessary to support proper post
installaon.
Use the composite shims included with your posts to
make sure your posts are plumb.
Secure posts by rst pre-drilling and then using 2-1/2”
lag bolts with washers to fasten through the decking and
into the framing structure/blocking to hold the posts in
place.
Cut or break o the shims.
Step #2 – Measure & Cut Aluminum Rails
Lay your boom rail on the deck centered between two posts.
Mark a line where the post is on both sides of the rail.
Measure back 5/8” from the rst line and mark a cut line on both
ends.
Lay the top rail beside the boom rail lining up the baluster connect-
ors.
Using the cut line from your boom rail mark a cut line on your top
rail as well.
Use a miter saw and cut the lines you have marked.
Components Included:
Top Level Rail w/ baluster connectors (1)
Bottom Level Rail w/ baluster connectors (1)
Top Level Rail Mounting Brackets w/ caps (2)
Bottom Level Rail Mounting Brackets w/ caps (2)
*Multi-Angle Brackets are available but must be
ordered separate and in packs of two.
Rail Support(s) (1-6’ or 2-8’)
Rail Support Baluster(s) (1-6’ or 2-8’)
Balusters (15-6’ or 21-8’)
#8X3/4” Pan Head Self Drilling Screws (13-6’ or 14-8’)
*Post Kits are sold separately
Check all local building codes before you begin!