Installation Guide

Pegatha Aluminum Railing
Level Rail Installaon Instrucons 2015 V1.0
Step #1 – Aluminum Post Installaon
Determine locaon of all posts prior to installing deck
boards.
Add blocking where necessary to support proper post
installaon.
Use the composite shims included with your posts to
make sure your posts are plumb.
Secure posts by rst pre-drilling and then using 2-1/2”
lag bolts with washers to fasten through the decking and
into the framing structure/blocking to hold the posts in
place.
Cut or break o the shims.
Step #2 – Measure & Cut Aluminum Rails
Lay your boom rail on the deck centered between two posts.
Mark a line where the post is on both sides of the rail.
Measure back 5/8” from the rst line and mark a cut line on both
ends.
Lay the top rail beside the boom rail lining up the baluster connect-
ors.
Using the cut line from your boom rail mark a cut line on your top
rail as well.
Use a miter saw and cut the lines you have marked.
Components Included:
Top Level Rail w/ baluster connectors (1)
Bottom Level Rail w/ baluster connectors (1)
Top Level Rail Mounting Brackets w/ caps (2)
Bottom Level Rail Mounting Brackets w/ caps (2)
*Multi-Angle Brackets are available but must be
ordered separate and in packs of two.
Rail Support(s) (1-6 or 2-8)
Rail Support Baluster(s) (1-6 or 2-8)
Balusters (15-6 or 21-8)
#8X3/4 Pan Head Self Drilling Screws (13-6 or 14-8)
*Post Kits are sold separately
Check all local building codes before you begin!

Summary of content (2 pages)