® SB26C / SB26D Series Simulated Domes Installation/Operation Manual C1403M - 2/94 Pelco • 3500 Pelco Way, Clovis, CA 93612-5699 • USA • (800) 289-9100 or (1-559) 292-1981 FAX (800) 289-9150 or (1-559) 292-3827
TABLE OF CONTENTS Section Page 1.0 SCOPE ..............................................................................................................................................1 1.1 DESCRIPTION ......................................................................................................................... 1 1.2 WARNINGS ..............................................................................................................................1 2.0 INSTALLATION ........................
INSTALLATION/OPERATION MANUAL Model SB26C AND SB26D SIMULATED DOMES 1.2 WARNINGS Prior to installation and use of this product, the following WARNINGS should be observed. 1.0 SCOPE 1. Installation and servicing should be done by Qualified Service Personnel and conform to all local codes. 1.1 DESCRIPTION 2. Pelco's SB26 Series is a series of simulated discreet indoor enclosures.
2.0 INSTALLATION CAUTION: Make certain that the mounting surface is capable of supporting the full load of the retaining plate, dome, camera mount and camera. 2.2.1 Conductor Requirements If a camera is used with the SB26C, the following can be used as guidelines for determining the maximum wire lengths for a hard-wire system. Camera Wire Length (120 VAC Camera @ vA) Handle the lower dome with care so as not to scratch or fingerprint the viewing window. Maximum Cable Distance 2.
3.0 CARE AND MAINTENANCE 4.0 SERVICE AND REPAIR Regularly scheduled maintenance will prolong the operational life and appearance of the equipment. 4.1 RECOMMENDED EQUIPMENT AND TOOLS 1. IMPORTANT: The lower dome of the SB26C simulated domes is an optical surface. When cleaning the surface of the dome and the viewing window, treat the surface as carefully as you would a fine camera lens. 1. 2. 3. If dust or other debris accumulates on the inside of the lower dome, remove with clean air pressure.
5.0 EXPLODED ASSEMBLY DIAGRAM Figure 2.
6.0 MECHANICAL PARTS LIST The following parts list corresponds to the exploded assembly diagram in Figure 2. Item Quantity Description 1 2 3 4 1 1 4 1 Tilt table Tilt table base Ball Stud Receiver Dome 5 6 7 8 9 10 1 1 1 3 1 4 Tile plate Dome/ceiling rod Trim Ring Wing nut Eye bolt Washer Part Number (SB26C only) (SB26C only) (SB26C) (SB26D) (SB26C, SB26D) (SB26C, SB26D) EM44004005PNT EM44004006PNT PT180410001 81410001-1 SB25D1000 SB264100COMP SB25D4001COMP SB262ASSY ZH1/4-20NUTSW ZH1/4.20X2.
.0 WARRANTY AND RETURN INFORMATION WARRANTY RETURNS Pelco will repair or replace, without charge, any merchandise proved defective in material or workmanship for a period of one year after the date of shipment. Exceptions to this warranty are as noted below: • Five years on FT/FR8000 Series fiber optic products. • Three years on Genex® Series products (multiplexers, server, and keyboard).