RM2100/2196 VCR Rack Mount Kit Installation/Operation Manual C806M (3/97) Pelco • 3500 Pelco Way, Clovis, CA 93612-5699 • USA • (800) 289-9100 or (1-559) 292-1981 FAX (800) 289-9150 or (1-559) 292-3827
CONTENTS Section Page 1.0 GENERAL .................................................................................................. 1 1.1 IMPORTANT SAFEGUARDS AND WARNINGS ............................... 1 1.2 UNPACKING INSTRUCTIONS. ......................................................... 2 2.0 DESCRIPTION ........................................................................................... 3 3.0 ASSEMBLY ............................................................................................
1.0 GENERAL 1.1 IMPORTANT SAFEGUARDS AND WARNINGS Prior to installation and use of this product, the following WARNINGS should be observed. 1. Installation and servicing should only be done by qualified service and installation personnel. 2. Installation shall be done in accordance with all local and national electrical and mechanical codes utilizing only approved materials. 3. Use only installation methods and materials capable of supporting four times the maximum specified load.
1.2 UNPACKING INSTRUCTIONS. Unpack and inspect all parts carefully. The following items are supplied: 1 1 1 1 1 1 2 RM2100/2196 Manual Side Panel, left Side Panel, right Base Cross Bar Front Panel w/Smoked Lexan Window and Locking Knob Keys Be sure to save the shipping carton and any inserts. They are the safest material in which to make future shipments.
2.0 DESCRIPTION NOTE: The RM2100/2196 is de- signed for front loading VCRs only and will fit any standard 19 inch (48.26 cm) rack. The RM2100/2196 VCR Rack Mount Kit has been specifically designed to provide rack mounting and security for GYYR™ Model TLC2100 and TLC2196 time-lapse video recorders. The design of the RM2100/2196 VCR Rack Mount allows the customer complete removal of the front panel for easier installation and better access to the VCR.
4.0 INSTALLATION REMINDER: The RM2100/2196 requires a minimum rack opening of 7.00" (17.78 cm). CAUTION: The front panel is not permanently attached to the rack mount and is therefore not supported when unlatched. 1. With the front panel off, find a suitable opening in the console and insert the VCR rack mount carefully. 2. Holding the mount in place, align the holes on the rack and start each of the (4) 10-32 screws. Tighten the screws. 3.
6.0 CARE AND MAINTENANCE It is recommended that only an antistatic, non-abrasive cleaner be used for cleaning the front panel.
7.0 WARRANTY AND RETURN INFORMATION WARRANTY Pelco will repair or replace, without charge, any merchandise proved defective in material or workmanship for a period of one year after the date of shipment. Exceptions to this warranty are as noted below: • Five years on FT/FR8000 Series fiber optic products. • Three years on Genex® Series products (multiplexers, server, and keyboard).