Operation Manual

57
4. Secure the appliance in
position.
5. Make the gas connection. Check the gas connections with a soap/water
mixture (see "Gas Connection").
6. Put the plug in the socket (see "Electrical Connection").
7. Test to check the appliance is operational.
The building in of the hob in combination with a built-in oven is described in
the installation guide for the oven.
Attention:
The underside of this built-in hob becomes hot. Take care that you do not
place any flammable or plastic objects in any drawer under the appliance.
installation instructions
56
installation instructions
560
490
589
510
47
min. 50
600
building in
1. Make the cut-out in the work surface. Ensure that there is sufficient space
allowed at the sides and at the back.
GKB410/415/416/417 GKB470W/472W
GKB475/477/478 GKB475W/477W/478W
Please note:
The distance between the hob and the rear wall must be at least 50 mm.
2. Make a hole in the side of the kitchen cabinet to enable the gas pipe to be
passed through.
3. Place the appliance in the cut-out.
720
510
47
560
490
600
min. 50
720
510
47
560
490
600
min. 50
720
510
47
560
490
600
min. 50