BYPASS OPERATION
1. Valve is in service when blue handles are turned parallel to inlet and out.
2. Valve is in bypass when both handles are turned clockwise and are perpendicular to inlet and outlet ports.
3.Todepressurizeadownowsystem:
a. Turn blue handle of supply side clockwise to be perpendicular to port.
b.Openadownstreamwatertap/faucettorelievepressure.
c. Turn blue handle on treated water side clockwise so it is perpendicular to the port.
d.RemovetheFleck125In-and-OutValvebyslowlyunthreadingthecouplingnuts.
4.Todepressurizeanupowsystem:
a.Turnoffmainwatersupply.
b.Openadownstreamwatertaptorelievepressure.
c. Turn both blue handles clockwise so they are perpendicular to the ports.
d.Turnmainwatersupplybackon.
e.RemovetheFleck125In-and-OutValvebyslowlyunthreadingthecouplingnuts.
As an option, a relief valve can be installed in either of the two ¼”-18 NPT ports and used to relieve pressure in the Fleck 125 In-and-Out
Valve afterthebypassvalvehasbeenputinthebypassposition.Followtheinstructionsbelow,items7and8,forpreparingthese
ports for use.
DIMENSIONAL DRAWINGS
29.6
1.17
47.8
1.88
69.7
2.74
25.4
1.00
36.8
1.45
55.8
2.20
68.6
2.70
120.7
4.75
133.2
5.24
1/4"-18 NPT FEMALE THREAD
TWO PLACES
TO OPEN, DRILL THROUGH
WITH 5/16" DRILL MAX.
36.8
1.45
47.9
1.89
25.4
1.00
69.7
2.74
68.6
2.70
138.4
5.45
36.8
1.45
55.8
2.20
145.8
5.74
1/4"-18 NPT FEMALE THREAD
TWO PLACES
TO OPEN, DRILL THROUGH
WITH 5/16" DRILL MAX.
62134-01
62134-02
1.Theinformation,specicationsandillustrationsinthemanualarebasedonthelatestinformationavailableatthetimeofrelease.
Themanufacturerreservestherighttomakechangesatanytimewithoutnotice.
2.Thisproductshouldbeinstalledbyaplumbingprofessional.
3.Thisunitisdesignedtobeinstalledonpotablewatersystemsonly.
4.CheckallapplicableplumbingandbuildingcodesforinstallationcomplianceItisestablishedthatwhendaytimewaterpressureexceeds80psi(5.5bar),
themaximumpressureratingof125psi(8.6bar)canbeexceeded.Apressureregulatormustbeinstalledonthissystemorwarrantyisvoided.
5.Donotplacetheunitindirectsunlight.Blackunitswillabsorbradiantheat,increasinginternaltemperatures.
6.Donotstrikethevalveoranyofthecomponents.
7.Donotusepetroleum-basedlubricantssuchasVaseline,oils,orhydrocarbon-basedlubricantsonanyo-rings.Useonly100%siliconelubricants.
8.Whenusingtestports:
-Toopenports,drillthroughwithcleandrillnolargerthan5/16”priortoinstallationofFleck125In-and-OutValveontank.Useacleandrillbitfreeofoil
anddonotuseanydrillinglubricant.
-Besuretocleanoutanychipsordebrispriortoinstallation.
-Donotusemorethan2wrapsofTeontapewheninstallingacomponenttotheseports.Donotusepipedope.
-Wheninstallingcomponentintothe¼-18NPTports,donotexceed25Lb-intorque.
IMPORTANT! PLEASE READ