Installation Guide

www.PITCHTOCODE.com
MADE IN USA
CONTENTS
Instruction
Sheet
Universal
Pipe Clamps
Standoffs
HARDWARE & TOOLS NEEDED
Screws
Drill
4. Repeat steps 1-3 on all
additional intervals to maintain
proper pitch during installation.
* Arrow indicators on the Universal Pipe Clamp rotate depending on orientation of clamp.
** Consult your local and federal building code as well as equipment manufacturer instructions for exact requirements.
NOTE: Some installation runs exceed 60 feet (18 meters) for condensate, 32 feet (9 meters) for waste. In these cases,
Standoffs can be stacked using dovetails provided.
1. Align Universal Pipe Clamp to
Standoff using the ruler
indicator*, snap Universal Pipe
Clamp onto Standoff at pitch
interval needed to meet local,
state or federal building code
requirements**. Ensure teeth on
Universal Pipe Clamp snap into
teeth on Standoff.
2. Secure Standoff base onto
substrate (i.e. floor or ceiling
joists, plywood, etc.) in
appropriate location per building
code. Use minimum of two
screws in opposing slots provided
for better stability. Four screws
are recommended for all
standoffs.
3. Push pipe into side opening
on Universal Pipe Clamp to
secure.
ENGLISH INSTRUCTIONS
ADJUSTABLE FASTENING SYSTEM
5x 5x 1x
SCAN TO GO ONLINE
WITH YOUR SMARTPHONE!

Summary of content (4 pages)