Instructions / Assembly

Site and Material Preparation
A) Remove carpet and padding. Also remove any wood ooring installed on concrete. Do not remove products unless they are
asbestos-free.
B) Undercut door frame and wallbase. Slide the ooring at least
1
/4" underneath the door frame and wallbase. Also leave a concealed
3
/8" minimum expansion space under each.
C) Remove bumps or peaks in suboor and ll depressions with oor leveling compound to ensure no more than
3
/16" unevenness per
10-foot span.
D) Acclimate unopened product before installation.
E) Clean debris from suboor before installation.
F) For concrete suboors, install vapor barrier with overlapped seams of 8" or more.
G) For planks without attached underlayment, install over single layer of underlayment appropriate for laminate oors.
PERGO XP Install Instructions
Site and Material Preparation
A
Door Frame
Cutting Line
Wallbase
Casing
1 inch
(2,5 cm)
B
%
48 hours
60° – 85° F
15° – 29° C
35% – 65% RH
D
C
E
G
suboor
F
6 mil (0.15 mm) virgin
polyethelene vapor barrier
> 8" (200 mm)