Site and Material Preparation
A) Remove carpet and padding. Also remove any wood ooring installed on concrete. Do not remove products unless they are
asbestos-free.
B) Undercut door frame and wallbase. Slide the ooring at least
1
/4" underneath the door frame and wallbase. Also leave a concealed
3
/8" minimum expansion space under each.
C) Remove bumps or peaks in suboor and ll depressions with oor leveling compound to ensure no more than
3
/16" unevenness per
10-foot span.
D) Acclimate unopened product before installation.
E) Clean debris from suboor before installation.
F) For concrete suboors, install vapor barrier with overlapped seams of 8" or more.
G) For planks without attached underlayment, install over single layer of underlayment appropriate for laminate oors.
PERGO XP Install Instructions
Site and Material Preparation
A
Door Frame
Cutting Line
Wallbase
Casing
1 inch
(2,5 cm)
B
%
48 hours
60° – 85° F
15° – 29° C
35% – 65% RH
D
C
E
G
suboor
F
6 mil (0.15 mm) virgin
polyethelene vapor barrier
> 8" (200 mm)