Instructions / Assembly

Site and Material Preparation
A.) Remove carpet and padding. Also remove any wood ooring installed on concrete. Do not remove products unless
they are asbestos-free.
B.) Undercut door frame and wallbase. Slide the ooring at least 1/4” underneath the door frame and wallbase. Also
leave a concealed 3/8” minimum expansion space under each.
C.) Remove bumps or peaks in suboor and ll depressions with oor leveling compound to ensure no more than 3/16”
unevenness per 10-foot span.
D.) Acclimate unopened product before installation. If there is no time for acclimation, there should be no more than
a difference of 25° F and 20% relative humidity between the stocking/transportation environment of the
ooring and the nal installation environment of the ooring.
E.) Clean debris from suboor before installation.
F.) For concrete suboors, install vapor barrier with overlapped seams of 8” or more.
G.) For planks without attached underlayment, install over single layer of underlayment appropriate for laminate
oors. For planks with attached underlayment, it is acceptable to install Pergo FloorMate™ underlayment prior to
ooring installation if desired. Make sure to follow the Pergo FloorMate™ installation instructions, taking special care
to seal all foam edges with sealing tape and repair all rips and perforations in the underlayment vapor barrier prior to
ooring installation. A separate vapor barrier should not be used in conjunction with Pergo FloorMate™.
PERGO Outlast+ Install Instructions
Site and Material Preparation
A
Door
Frame
Cutting Line
Wallbase
Casing
1 inch
(2,5 cm)
B
%
48 hours
60° – 85° F
15° – 29° C
35% – 65% RH
C
D
G
subfloor
6 mil (0.15 mm) virgin
polyethelene vapor barrier
> 8" (200 mm)
E F
2019_03_OP_UNI