Installation Guide

PERGO TimberCraft + WetProtect Floor Install Instructions
2
2018_0129_TIM_INST
Site and Material Preparation
A) Remove carpet and padding. Also remove any wood flooring installed on concrete. Do not remove products
unless they are asbestos-free.
B) Undercut door frame and wallbase. Slide the flooring at least
1
/4" underneath the door frame and wallbase.
Also leave a concealed
3
/8" minimum expansion space under each.
C) Remove bumps or peaks in subfloor and fill depressions with floor leveling compound to ensure no more than
3
/16" unevenness per 10-foot span.
D) Acclimate unopened product before installation. If there is no time for acclimation, there should be no more
than a difference of 25° F and 20% relative humidity between the stocking/transportation environment of the
flooring and the final installation environment of the flooring.
E) Clean debris from subfloor before installation.
F) For planks without attached underlayment, first install PERGO Gold™ Premium Underlayment over concrete or
wood subfloors per the installation instructions included in the PERGO Gold package.
Alternative underlayment
G) For concrete subfloors, first install vapor barrier with overlapped seams of 8" or more.
H) For planks without attached underlayment, install over a single layer of underlayment appropriate for
laminate floors.
A
Door
Frame
Cutting Line
Wallbase
Casing
1 inch
(2,5 cm)
B
%
48 hours
60° – 85° F
15° – 29° C
35% – 65% RH
C
H
subfloor
6 mil (0.15 mm) virgin
polyethelene vapor barrier
> 8" (200 mm)
D
E
G
F