Installation Guide

4 in 1 Molding for Flooring | English
Installation Instructions
Step 1
Review Installation Checklist
Do not push parts into track until ready to install in final position.
Do not remove from track once installed.
Use a new saw blade for best cutting results.
Depending on molding type, all parts may NOT be used.
Always install screws in end holes of track and then every other hole.
For concrete floors, drill hole using 3/16" (5mm) diameter drill, insert
plastic anchor, then use screw.
Attach the track directly to the subfloor (remove any padding or
underlayment).
Laminate flooring installations require the use of T-Moldings in
doorways 4 feet (1.22 meters) or less and in rooms 40 feet (12.2 meters)
or larger in length or width.
This product has been finished for you; do not sand or paint.

Summary of content (7 pages)