Tap Installation Instructions
PERLICK RESIDENTIAL INSTALLATION MANUAL FOR BEER DISPENSING EQUIPMENT
6 | perlick.com/residential
Locate the dispensing head , black beer line(s), and hose
clamp(s). Slide one end of each beer line onto the stainless
steel tubes which protrude out the boom of the dispensing
head and clamp ght.
Remove transit tape with a ulity knife around the hole in the
top of the unit from both inside and outside of the cabinet.
Gently punch out foam w/screwdriver and remove. Insert the
beer line(s) through the hole in the counter top. Move head
aside and bead silicone around perimeter of hole, and then
posion the head back in place. Fasten using the 4 chrome
screws included with the dispensing head. Wipe o excess
silicone to complete the seal.
1.
2.
Use the 3/8” -thick foam pad included in the tapping kit and
roll into a cylinder. From inside the cabinet, insert the foam
tube up through the hole in the counter top unl it is rmly
against the insulaon in the dispensing head. Mark, then cut
away any excess foam.
NOTE: If using an Adara tower, foam needs to be installed so
that it is pressed up against the boom mounng ange of
the tower.
3.
INSTALLATION