Installation Sheet

7
perlick.com
PERLICK RESIDENTIAL INSTALLATION MANUAL FOR BEER DISPENSING EQUIPMENT
Insert end of the snorkel up into the tower and screw
air scoop mounting bracket into vacated holes above
the fan.
6.
Install the Air Scoop Kit. Start by removing the upper set
of screws located above the fan on the back wall of the
cabinet.
Assemble components from the kit as follows – Insert
black snap bushing into air scoop mounting bracket,
then insert one end of the air snorkel through the snap
bushing. A zip tie can be inserted behind the mounting
bracket to keep the tube in place.
NOTE: For Adara Towers, the air snorkel consists of a 3 inch
piece of black tubing and a 3 inch piece of clear tubing that
slides over each other and then is clamped using included
worm drive clamp. The black tube is inserted per the above
instructions and secured with the included zip tie. The
clear tube is installed over the air “T” from the dispensing
head and secured with the included worm drive clamp. See
Figure 4 on page 5 for illustration.
4.
5.