Installation Guide

16
18
17
19
16 PLASTERGUARD REPLACEMENT
Replace plasterguard (16A) into Valve Body and secure with Screws (16B).
Proceed to nish wall.
17 FINISH WALL PREPARATION
Make appropriate holes to nished wall. Price Pster recommends that all Tub
Spout and Shower Outlet holes be 1
1
/
4
” diameter. For center hole on plaster
wall use 4
3
/
4
” diameter.
CAUTION: Make sure that leak tests and ushing are performed before
preparing the nished wall.
18 THIN WALL INSTALLATION
Knock out Center Section (18A) of Plaster Guard (18B) and remove Screws
(18D). For installation of thin walls, use Support Plate (18C) in addition to
Plaster Guard (18B). For installation to other wall types, do not use Support
Plate (18C). Use of Plaster Guard (18B) is optional. For center hole on a thin
wall use 4” diameter.
19 REVERSED INLET LINES
If hot and cold inlets are reversed (back-to-back installation), (19C) unscrew
the plaster guard and bonnet assembly. Rotate the Bonnet Assembly (19A)
180° with Notch (19B) facing up and reassemble.
NON STANDARD INSTALLATIONS
6
ENGLISH
ENGLISH
18B
19C
1
1
/
4
” Dia
1
1
/
4
” Dia
4
3
/
4
” Dia
4” Dia
18C
18B
18A
18C
18D
SHWR
TUB
HOT COLD
COLD HOT
180°
19A
19A
16B
16A
19B