Installation Guide

ENGLISH
ENGLISH
7 8
9
10
8 TRIM FLANGE ATTACHMENT
Position Flange (8A) on Valve (8B) with Drain Hole (8C) at the bottom. Place
Protective Washer (8D) on the short end of the reversible Retainer Sleeve
(8E). Screw Retainer Sleeve (8E) onto threaded section of the Stem and
Bonnet (8G). Tighten Retainer Sleeve (8E) by hand until Flange (8A) is snug
to nished wall surface. If the short end of the Retainer Sleeve (8E) is too
short, reverse it to use the longer end.
9 FLOW FUNCTION HANDLE ATTACHMENT
With valve in CLOSED” position, place and align Handle Hub (9A) onto
Cartridge Gears (9B). Be sure Lever (9C) is facing down. Secure with Set
Screw (9D).
7 TEMPERATURE ADJUSTMENT
Adjustment Gear (7A) is factory-set to prevent stem from reaching full hot
position. To determine if factory setting is satisfactory, turn on valve and rotate
Stem (7B) counterclockwise to full hot and test. If not, remove Adjustment Gear
(7A) with valve at full hot setting. To adjust valve to a colder setting, rotate Stem
(7B) clockwise or counterclockwise to a hotter setting (Use a thermometer for
measuring). Pster recommends a maximum temperature setting of 110°F
(43°C). Replace Adjustment Gear (7A) onto Stem (7B) by aligning the surfaces
of Valve Stop (7C) and Adjustment Gear Stop (7D) as shown. Once placed,
Stem (7B) should not rotate any further in the counterclockwise direction.
3
7D
7A
7A
7C
7B
7B
7B
7B
DECREASE
MAXIMUM
TEMPERATURE
Clockwise
Rotation
INCREASE
MAXIMUM
TEMPERATURE
Counterclockwise
Rotation
8A
8G
8B
8E
8D
8C
8C
10A
9A
9B
9C
9D
10B