Installation Guide

ENGLISH
ENGLISH
7
11
DRAIN BODY INSTALLATION
8
9
10
7 SECURING FAUCET
From underneath sink, secure Faucet Body (7A) by placing Metal Washer (7B) and
threading Long Nut (
7
/
16
Hex.) (7C) onto Mounting Post (7D). Make sure that the bumps
on Metal Washer (7B) are facing up. Firmly hand tighten Long Nut (7C). Secure Long
Nut (7C) not to exceed a
1
/
4
turn.
Caution: Do not over tighten!
8 WATER SUPPLY LINES
Gently separate hot and cold Supply Tubes (8A), approximately three inches apart.
Connect water Supply Lines (8C) to Faucet Inlets (8B). Hot water supply line goes to hot
inlet fitting indicated by red tag (8D). (Supply lines not included). Follow manufacturer’s
instructions when installing supply lines.
Hold the Faucet Inlets (8B) steady using an adjustable wrench while tightening Supply
Lines (8C). Do not twist Supply Tubes (8A)!
9 POP-UP ROD CONNECTION
Insert Lift Rod (9A) into hole at the back of Faucet Body (9B).
10 POP-UP INSTALLATION
Install and adjust Pop-Up (10A) using separate instructions supplied with the Pop-Up
assembly.
11 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
3
HOT
COLD
7A
7B
7C
7D
8A
8B
8C
8A
8B
8C
10A
9A
9B
8D