Installation Guide

ENGLISH
ENGLISH
11
DRAIN BODY INSTALLATION
10
12
10 HOSE CONNECTION
From underneath sink, push Center Connector (10A) onto receiving Tube (10B), until
unable to push any further. Pull down on Center Connector (10A). If the housing and
the Inner Collet (10C) separate slightly but do not pull off receiving Tube (10B), the
connection is secure.
To remove, push up on Center Connector (10A) holding plastic Collet (10C) in place,
pull down on Center Connector (10A) until Tube (10B) is free.
Slide the End Connectors (10D) with arrow (10E) pointing up onto the Valve Bodies
(10F). Push the End Connectors (10D) all the way up until completely seated. Be
careful not to damage O-Rings (10G).
11 WATER SUPPLY CONNECTIONS
First, thread Inlet Connectors (11A) into Water Supply Lines (11B). Then, insert Inlet
Connectors (11A) into Valve Bodies (11C). Hot water supply lines go into left inlet.
Cold water supply lines go into right inlet. (Supply lines not included). Please follow
manufacturer’s instructions when installing supply lines. Next, insert Clips (11D) into
Valve Body Holes (11E), to secure unit.
WARNING: Do not twist Inlet Connectors (11A) once installed!
12 POP-UP INSTALLATION
Install and adjust Pop-Up (12A) using separate instructions supplied with the Pop-Up
assembly.
4
HOT
COLD
12A
10B
10B
10A
10D
10F
10F
10G
10G
10E
10D
10A
10C
10B
10A
10A
10C
11A
11D
11D
11E
11D
11A
11B
11B
11C
11C