Instructions / Assembly
ENGLISH
ENGLISH
10
11
7
9
8
7 SECURING FAUCET
From underneath sink, secure Faucet Body (7A) by placing Metal Washer (7B) and
threading Long Nut (
7
/
16
Hex.) (7C) onto Mounting Post (7D). Make sure that the bumps
on Metal Washer (7B) are facing up. Tighten loosely, make sure Handle (7E) swings
equally in both directions. Firmly hand tighten Long Nut (7C). Make sure Lift Rod (7F)
moves freely. Secure Long Nut (7C) not to exceed a
1
/
4
turn.
Caution: Do not over tighten!
8 WATER SUPPLY CONNECTIONS
Gently separate hot and cold Supply Tubes (8A), approximately three inches apart.
Connect water Supply Lines (8C) to Faucet Inlets (8B). Hot water supply line goes to hot
inlet tting indicated by red tag (8D). (Supply lines not included). Follow manufacturer ’s
instructions when installing supply lines. Do not twist Supply Tubes (8A)
9 POP-UP INSTALLATION
Install and adjust Pop-Up (9A) using separate instructions supplied with the Pop-Up
assembly.
10 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
11 VALVE FUNCTION
By lifting the Lever Handle (11A) up, the valve will be activated allowing water to ow.
The water ow will increase by continuing to lift up the Lever Handle (11A). By rotating
the Lever Handle counter-clockwise, the water temperature will decrease to cold ow
only. By rotating the Lever Handle clockwise, the water temperature will increased to
hot ow only.
Note: Flush faucet before turning on valve (see step 12)
DRAIN BODY INSTALLATION
FAUCET FUNCTION
3
7B
7C
7A
7F
7E
9A
11A
11A
HOT COLD
OPEN
8A
8C
8C
8B
8D
8B
8A
HOT
COLD
7D