Installation Guide

ENGLISH
ENGLISH
7 9
10
8
7 SECURING FAUCET
From underneath sink, secure Faucet Body (7A) by placing Metal Washer (7B) and
threading Long Nut (
7
/
16
Hex.) (7C) onto Mounting Post (7D). Make sure that the bumps
on Metal Washer (7B) are facing up. Firmly hand tighten Long Nut (7C). Secure Long
Nut (7C) not to exceed a
1
/
4
turn.
Caution: Do not over tighten!
9 WATER SUPPLY LINES
Gently separate hot and cold Supply Tubes (9A), approximately three inches apart.
Connect water Supply Lines (9C) to Faucet Inlets (9B). Hot water supply line goes to hot
inlet tting indicated by red tag (9D). (Supply lines not included). Follow manufacturers
instructions when installing supply lines.
Hold the Faucet Inlets (9B) steady using an adjustable wrench while tightening Supply
Lines (9C). Do not twist Supply Tubes (9A)!
10 POP-UP ROD CONNECTION
Insert Lift Rod (10A) into hole at the back of Faucet Body (10B).
8 FLUSH WATER LINES
A. Point lines into Bucket. TURN WATER BACK ON.
B. Flush the water lines. Allow water to run for at least 30 seconds. TURN WATER
BACK OFF BEFORE CONTINUING INSTALLATION.
3
HOT
COLD
7A
7B
7C
7D
9A
9B
9C
9A
9B
9C
10A
10B
9D
A
B