Service manual

2-1-3 T6450MEN
STANDARD MAINTENANCE
[ 14PV385/ (01, 07, 39) ]
Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head) using
90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording model only
* B86 ------ Not used in 2 head model.
H: Hours : Cleaning I : Replace
Deck Periodic Service Schedule
Ref.No. Part Name 1,000 H 2,000 H 3,000 H 4,000 H
B2
Cylinder Assembly
II
B3 Loading Motor Assembly
I
B8
Pulley Assembly
II
B587
Tension Lever Assembly
II
B31 ACE Head Assembly
I
B573, B574
Reel S, Reel T
I
B37
Capstan Motor
II
B52 Cap Belt
II
*B73
FE Head
I
*B86
F Brake Assembly (HI)
II
B133 Idler Assembly (HI)
II
B410
Pinch Arm Assembly
II
B414
M Brake (SP) Assembly (HI)
II
B416 M Brake (TU) Assembly (HI) II
B525
LDG Belt
II