PSW-H Installation and User Manual
www.phocos.com    20  | P a g e    
8.  Switch on the AC input breaker of each unit in quick succession, if an AC source is installed. If this takes too 
long, then some units may show fault 82 on their screen, but they will restart automatically and upon 
detecting a valid AC input, will function normally. 
9.  If a valid AC input source is detected and the three phases match with the unit settings in settings menu 
number 28, they will work normally. Otherwise, the    symbol will flash and Grid Mode will not function. 
In this case, check that the order or the three phases is correct. If necessary, turn off all units and then switch 
the setting in settings menu number 28 for all Phase L2 units to Phase L3 and vice-versa by following steps 1 
to 5. Then continue with step 7. The displays will now show the following: 
Screen of Units on Phase L1 
Screen of Units on Phase L2 
Screen of Units on Phase L3 
10.  If there are no further faults displayed, the 3-phase system installation is complete. The breakers on the AC 
output of each unit can be switched on and then loads may be connected. 
Split-Phase (2-Phase), One or more Units per Phase 
Follow these steps once the wiring is completed: 
1.  Turn on the unit on phase 1 with its AC output on/off switch. If PV is available, switch it on with its breaker. 
Otherwise, if an AC source is available, switch it on with its AC input breaker. 
2.  In the Settings Menu (see chapter “Device Operation Settings”) navigate to settings menu 28. 
3.  Turn the AC output on/off switch off to deactivate the AC output. The unit will remain in Stand-By mode for 
under a minute and the display will stay on for this time. 
4.  Set the menu number 28 setting from the default value “Single” (SIG) to “Phase L1 for split-phase” (2P1). This 
will not be possible if the unit is not turned off as described in the previous step. Press    so the entry 
stops blinking. Now press the    button to accept the new setting and return to the main view. 
5.  Switch off the PV and AC input breaker if they were on. Once the setting is confirmed, wait for the unit to 
shut down automatically, the display will then turn off completely. 
6.  Repeat steps 1 to 5 with each further unit connected on the same phase 1. Then repeat steps 1 to 5 for each 
unit in phase 2 and, instead of choosing “Phase L1 for split-phase” in step 4, choose “Phase L2 for split-phase” 
(2P2). 
7.  Now turn on each unit. The units will show the following in their respective screens: 
Screen of Units on Phase L1 
Screen of Units on Phase L2 
8.  Switch on the AC input breaker of each unit in quick succession, if an AC source is installed. If this takes too 
long, then some units may show fault 82 on their screen, but they will restart automatically and upon 
detecting a valid AC input, will function normally. The displays will show the following: 