User Manual

EMpro - multifunctional energy measuring devices for DIN rail mounting
40 / 196
PHOENIX CONTACT 109357_en_00
5.2.3 Step 3: Configuration of the current input (current
transformer)
Configuring the current input is the third step of the basic device configuration.
Figure 5-15 Current input, current transformer
Primary Enter the primary current of the application here.
Secondary Select the secondary current (1 A or 5 A) of the current transformer.
Inversion With this function, the respective phase of the current transformer is inverted by the
firmware. It is no longer necessary to rewire the two conductors.
Depending on the device selection and the associated device-specific current sensors,
the current input setting may vary.