:3.8 DE THAILAND DHAKA TIGER MOTH BUILDING INSTRUCTION PRODUCT LIST: 1* Assembled Balsa Tiger Moth KIT: Plywood sheet pacic™! 1:1 installation drawing®t Batten sets Operation instruction®? Fiber cowl! Fiber servo arms®3 Metal landing gear sei! Tall wheel set*1 Main wheel* 1 pair 4mm steel tube set*] Blister part*d Metal parts plate*2 Metal filing bag*1 4 0.8mm steel wirehair & mm steel wire 10M INTRODUCTION The de Handbill DH.
BUILDING INSTRUCTION. 1} SERVOS MOUNT IN FUSELAGE ASSEMBLY 2) NOSE ASSEMBLY 3) FUSELAGE FRAME ASSEMBLY P-3 4) STABILIZER AND ELEVATOR mmm P-5 5} FIN AND RUDDER P56 6) THE FUEL TANK ASSEMBLY ~ 7) WING CONSTRUCTION 8) MAIN LANDING GEAR — 9) OTHERS BUILDING INSTRUCTION 4.SERVOS MOUNT IN FUSELAGE ASSEMBLY : cL i Accurately make two pairs of A28 , A328a31 coincident with resin slug respectively. Then assemble all the pairs mass like the pictures.
{2)Giue the fuselage lateral plate and the strengthening battens. {3) Assemble the engine mount to fuselage. {4} Joint and glue the pine sticks. {4} Glue the bottom board A37. {6} Glue the bulkhead A8,A12,A13 and strengthening plate A38. . {7} Sanding the strengthening plates. {8)Glue the top cover board. Then glue ATD*2 AT T"2 AIB2.A18%2 according to the installation drawing.
{feint the referral frame of fuselage with battens according to the installation drawing. Then connect if on the fuselage. Ye {12) Gus the cover board and fx it with {13} Make a small cut for bending the battens easily. Then joint A23*2 B A24 | wood shes to make it more flat, and tha diagonal pillars, strengthening plates like the pictures.
4. STABILIZER AND ELEVATOR {1}Joint the fractal frame of fuselage with battens according to the installation drawing. Then connect it on the fuselage. {2)Giue the strengthening plate and ribs. Make sure the top of the ribs (8mm} on the middle of the 5*10mm batten, reserve 1mm both side for 1mm plywood sheets cover. 0 arm {3)Cut 1mm deep grooves for glue 1mm plywood sheet on ribs. {4)Sand it to be cambered. {B}Bend the 4mm stainless steel tube like the installation drawing.
{8)Cover the 1mm plywood sheets on ribs and then joint and glue on the elevator. 5.FIN AND RUDDER {1} Trim the 8*14*300mm batten like the picture, make the {2} Glue the ribs and 1mm plywood sheet. Each rib needs diameter of the fop semicircle be 4mm for connect the to ba glued two pes 1mm plywood sheet. 4mm stainless steal tube. i {3 Banding the 4mm stainless steal tubs, {4} Joint and glue the stainless steel ube and frameworks, And then glue the strengthening plate.
{8} Assemble the fin parts. {8} Cut 8 1mm deep grooves {both ends and middies, up and down side) an the vertical fin front batten like the picture, In order to glue 1mm plywood sheet in the grooves. {7} Sand the vertical fin front batten to be cambered. {8} Bore and install the deadline hinges. The vertical fin is finished. ay 6. THE FUEL TANK ASSEMBLY {8} Joint and glue the parts like the picture and then glue the 1mm plywood sheets cover.
{)Glue the wood bricks on the front(wider) and back {3) Finished then trim them fo be cambered. TYING CONSTRUCTION upper wing {1} Joint the ribs. {2} Bend the 4mm stainless steel tube according io the installation drawing, then glue to the wing. Suggest using fiber cloth to strengthen the sticking=joint.
{cutout the redundant wood until the wing assembly is {4} Notice: ths right side of the metal parts is counter to the finished and the glue dries. installation drawing. Sorry for that and we will correct the drawing in next batch production. {5 Make and install the metal parts like the pictures. {8)Mark the place of center line and then bore 3mm holes according to the holes of metal parts. And install the metal parts. ed E {make the metal pairs and fix them with screws.
{8} Accurately make pas D1 ribs coincident with resin glue Joint it on the wing. {10} Fix the Bros wood bars and metal parts with self-tapping scows. {12) Cover and glue 1mm plywood board. {8} Joint and glue the half ribs. {11} Pull $ 0.8mm tiles wires.
La | {13} Install the appropriate wood block on the mount of wing strut, and smooth it then install the metal parts like the pictures. LOWER WING {1} Glue the serve mount “C™ type strengthening plate. {2) Joint and glue the servo mount on £8 ribs Insert the strengthening plates and glue them to ribs. {3) The girders in the kit come with bevel, please notice {4} Fix the girders towards to the installation drawing with the installing direction for front and back girders. long steel nails.
{5} Glue the ribs’ strengthening plates except rib E1. {8} install the aileron girder, and insert&glue the strengthening plates. {7} Grimm the wingtip with the knife and glue rib £9. @ Overturn the wing and install the serve mount cover. {8) Mark the place of center ine and then bore 3mm holes according to the holes of metal parts. And install the metal parts.
{10}Bend the 4mm airlessness steel tube according to the installation drawing, then glue to the wing. Suggest using fiber sloth to strengthen the sticking~joint. {12} Joint and slug the half ribs. {14} Joint the strengthening plate for serve hom. { {11) Joint rib E1. And fix the wing on the installation drawing again, then pull ¢ 0.8mm steel wires. as d board (up and down}.
{18} Glue balsa wood sheet on the aileron girder and smooth it. And then glue 1mm plywood sheet on it. {Same steps as the wing girder.) {17} install the wing mounting metal parts with self-tapping screws. {18)Make the wing bolts and install them like the pickerels.
MAIN LANDING GEAR {1} Mai the metal parts and install the tall wheel. {2} Main landing gear parts. {3) Joint the spring &sliding sleeve, and lock with sate (4) Fix the damper on the shew! shaft with screw. nd of nuts, then insert it to steal tube and the connection, keep the shaft movable. {5} Joint the supporting steel tubes and finished. {8) Fix it on the frame.
OTHERS Make the fixture of cabin door, and fix apes Tm plywood with glue in #, then glue the battens. The process of wing strut. Assembly of tall servos. Supporting for the fuel tank.