SCALNIEUPORZEC1 DECONSTRUCTIONISM 21) stall the metal parts of the stay cogs) 22) Pale fuselage side govern 23) Make the landing gear assembly according to the drawing pattern.
SCALRBIEUPORZSCT DECONSTRUCTIONISM 24) Landing gear reassembly £5) Pale fuselage bollix cover 28 Use the A 7 wing rib as the laminate. mark the annulus cover then cutie redundant pairs and paste the balsa wood and polish; 21 Dig a threading Hole in the marked position.
SCALNIEUPORISL1 DECONSTRUCTIONISM 281 Paste the wing rib into the fuselage strut and paste the cover 291 Drill holes on the cover preparing io install landing gear sowers. 30) Assemble landing gear assembly and install steel wire stay 811 Paste the plywood to the tail of the fuselage.
SCALNIEUPORIZSC1 DECONSTRUCTIONISM 34) Installation of wing strut metal connectors, 37) Introduction of ensilage fairy and windshield, ZINGS ASSEMBLY 10 Assemble Ine wing spars ang nbs coordinating to the drawing and slick ine leading edge strips: