User Manual

PSEN cs1.1p
Operating Manual PSEN cs1.1p
21095-EN-08
13
CAUTION!
Extension of delay-on de-energisation
When several (n) devices are connected in series, the delay-on de-ener-
gisation time adds with the number of interconnected safety switches.
The may. delay-on de-energisation is composed of
max. delay-on de-energisation actuator
+ (n-1) x max. delay-on de-energisation of the inputs
+ delay-on de-energisation of the evaluation device
Suitable Pilz evaluation devices are, for example:
} PNOZelog for safety gate monitoring
} PNOZpower for safety gate monitoring
} PNOZsigma for safety gate monitoring
} PNOZ X for safety gate monitoring
} PNOZmulti for safety gate monitoring
Configure the switch in the PNOZmulti Configurator with switch type 3.
} PSS for safety gate monitoring with standard function block SB064, SB066 or
FS_Safetyî™…Gate
} PSSuniversal PLC for safety gate monitoring with function block FS_SafetyGate
The correct connection to the respective evaluation device is described in the instructions
for the evaluation device. Make sure that the connection is made in accordance with the
specifications in the instructions for the selected evaluation device.
The connections to two evaluation devices are shown on the following pages, by way of ex-
ample:
} PNOZ s3 and
} PNOZmulti
PNOZ s3
PSENcode
0 V
24 V
A1
A2
Y32
n.c.
S11
S21
12
22
2
7
8
6
1
3
4
5
PNOZ s3
A1
A2
S22
S12