User's Manual

Pilz GmbH & Co. KG, Sichere Automation, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: pilz.gmbh@pilz.de
5-3
5.2 Install base station
5 Installation
5.2Install base station5200Install base station5-
The base station always provides the termination for a PSSuniversal
system. No further modules may be positioned to the right of the base
station.
Prerequisite:
` The head module must be installed.
` A base module for a supply voltage module is always connected to the
right of the head module.
Please note:
` For mechanical reasons it is not possible to mix base modules with
screw terminals and base modules with cage clamp terminals.
` All contacts should be protected from contamination.
` The mechanics of the base modules are designed for 50 plug in/out
cycles.
Procedure:
` We recommend that you wire up the base modules before inserting
the electronic modules.
` Slot the groove on the base module on to the mounting rail from below
[1].
` Push the base module back [2] until you hear it lock into position.
` On the mounting rail, slide the base module to the left until you hear
the two lateral mounting hooks on the adjacent module lock into posi-
tion [3].