Installation Guide

5
REV-10 31, 12
Valve Installation
7. Carefully install the hose (I) to the valve outlets. The other end connect it
to ‘T‘ connector (E).
8. Do not overtighten the hose with adjustable wrench as it may damage
the valve assembly.
9. Ensure that hot and cold side stems are turning in correct direction. Con-
nect the valve assembly inlets to water supply tubes ( left is hot water
supply and right is cold water supply). Do not overtighten the hose with
adjustable wrench as it may damage the valve assembly.
10. Turn on the hot and cold water supply. Check for any leaks at all the
connections.
11. Remove the test plug. Turn on the both valves make sure there is ap-
propriate amount of water coming from the spout shank (A).
12. Turn off the valves. Reinstall the test plug.
13. Install the mud guards.