Installation Guide

3
REV-10 31, 12
Valve Installation
Thread the locknut (C) and rubber washer (B) from bottom of the spout 1.
shank (A).
Slide the spout shank (A) from the spout mounting hole. Slide the rubber 2.
washer (B) from underneath of the shank. Thread the locknut (C) from
underneath of the shank. Adjust the shank height to X” from nished
deck or nished rim.
Install the ‘T” connector (E) to beneath of the shank (A). Do not forget to 3.
place the washer (D) between the ‘T’ connector (E) and the shank (A).
Tighten the ‘T’ connector.
Slide the rubber & steel washer (G,H) on the hot side valve from the top. 4.
Thread locknut (F) from the top.
Place the valve from the mounting hole.5.
Adjust the locknut (F) so that the distance between nished surface 6.
and top of the valve is Y. Tighten rubber and steel washer (G,H) and
locknut (F) from underneath with the help of 1-7/16” socket or adjustable
wrench. Install Cold side valve as the same way.
Series ‘X’ ‘Y’
4BR7X0 1-11/16” 1-3/4”
4BR6X0 1-11/16” 1-3/4”
4BR8X0 1-11/16” 1-3/4”
4AM610 1-1/2” 1-3/4”
4MT6X0 1-5/16” 1-3/4”
4CL610 1-1/2” 1-3/4”