Engineering Excellence Engineering E xcellence Installation Guide Single Handle Tub And Shower Trim Set: • • • • • • • • • 4MT100T 4MT110T 4MT120T 4MT130T 4MT200T 4MT300T 4MT320T 4MT330T 4MT400T This product meets the following standards: • • ASME A112.18.1 ADA COMPLIANT Pioneer Industries, Inc.
Thank you for purchasing this Pioneer quality product. Tools Required Strap Wrench Teflon Tape Thermometer Allen Wrench Plumbers Putty Prior to Installation • Observe all local plumbing and building codes before you begin installation. • The finished wall and tub/shower valve (4020B or 4020B-D) must be installed prior to installing this trim. • Shut off main water supply. • Pioneer reserves the right to make changes in the design of faucets without notice as specified in the pricebook.
Trim Installation (For 4MT100T, 4MT200T) • • • • • • Remove the temporary nipple. IPS Installation:The 1/2” threaded pipe nipple must be kept with a length of 1-3/8” from finished wall. For tub spout(A) with tub spout escutcheon(B) slide the spout escutcheon(B) along the threaded pipe nipple. Apply teflon tape at the threaded connection. Screw tub spout(A) onto the pipe nipple and tighten by strap wrench.
Trim Installation(For 4MT110T, 4MT120T) • • • • • • Remove the temporary nipple. IPS Installation:Note:- The 1/2” threaded pipe nipple must be kept with a length of 7/16” from finished wall. Apply teflon tape at the threaded connection. Screw diverter tub spout(C) onto the pipe nipple and tighten by strap wrench. CXC Installation:Use CXC to 1/2” IPS adapter (X-5400008) and Mounting Tool (X-5400010) to install the tub spout for 1/2” copper tubing inlet.
Trim Installation (For 4MT100T, 4MT110T, 4MT300T) • • • • • • • • • Caution:- To avoid plugging the showerhead spray outlet use teflon tape on the shower arm threads. Remove temporary nipple from the shower elbow. Use silicon to caulk the back of the shower arm flange(D). Slide the shower arm flange(D) over the shower arm(E). Apply the teflon tape on the both threaded ends of shower arm (E) and install the shower arm(E) to the shower elbow. Carefully tighten with a clean strap wrench.
Trim Installation 1. 2. 3. 4. 5. 6. Turn off the main water supply Remove test cap (G) with the help of 1-11/32” socket, relive the water pssure ensure all the debris are flushed out of the system. Thread sleeve (H) to the valve body. Insert the cartridge (I) to the valve body. Ensure to install Cartridge unit so cold water flows first. Ensure the two notches underneath of the cartridge seats properly in the valve body. Hold the cartridge (I) and thread the locknut(J) to sleeve(H).
Trim Installation 7 REV-12 2, 13
Trim Installation • • • Place the face plate(N) on the valve. Ensure the rubber gasket(M) is placed behind the face plate (N) to form water tight seal. Slide the escutcheon (O) on the valve. Use silicon to caulk around the face plate (N). Secure the handle (R) by tightening the allen screw (P). Place hole cover (Q) on the handle (R). Ensure the handle rotates counter clockwise from cold to hot from 6 o’clock to 3 o’clock.
Trim Installation (For 4MT100T) 1. 2. 3. 4. • Remove the protective cover if placed on the valve. Thread the valve sleeve (S) on the valve. Install the handle adapter (T) on the diverter valve stem. secure the handle adapter (T) with the screw. Slide the face plate (T) on the valve sleeve. Ensure the rubber gasket is behind the face plate (T). If necessary apply silicon to caulk around the face plate (T) to form water tight seal. Install the handle (V) on the handle adapter (T).
Engineering Excellence Engineering E xcellence 3325 S. Garfield Ave. | Commerce, CA 90040 Telephone: (800) 338-9468 | (323) 888-8873 | Fax: (323) 888-9515 Hours: M - F, 7:30am to 5:00pm PST www.pioneerind.