Installation Guide

6
REV-12 2, 13
Trim Installation
Turn off the main water supply1.
Removetestcap(G)withthehelpof1-11/32”socket,relivethewater2.
pssureensureallthedebrisareushedoutofthesystem.
Threadsleeve(H)tothevalvebody.Insertthecartridge(I)tothevalve3.
body.EnsuretoinstallCartridgeunitsocoldwaterowsrst.Ensure
the two notches underneath of the cartridge seats properly in the valve
body.Holdthecartridge(I)andthreadthelocknut(J)tosleeve(H).
Threadretainercap(K)toretainernut(J).
For back to back installation:- Rotate the cartridge 180 Degree. Ensure 4.
‘B-BUP’symbolonthecartridgeisonthetop.Followtheinstructionon
3toinstallsleeve(H),locknut(J)andretainercap(K).
Turnonthemainwatersupply.Checkforanyleak.Turnthecartridge(I)5.
counterclockwise to the full open position. Allow water to run for some
time until the hot water comes out. Check the temperature with ther-
mometer for the hot water.
If necessary to reduce the hot water temperature then, turn off main 6.
watersupply.Removethecartridgebyremovingretainercap(K)
andlcoknut(J).Turnredtemperatureadjustingring(L)clockwiseto
decrease the temperature. Follow instruction 3 or 4 to reassemble the
cartridge(I).Ensurethehotwatertemperatureissetbelow120°F.