Installation Guide

3
REV-11 19, 12
Faucet Installation
Place base plate (A) underneath the faucet.•
Apply adequate amount of plumbers putty or sealant underneath of •
base plate (A) if necessary.
Lead the faucet inlet (B) through faucet holes. Make sure ‘Pioneer •
logo face toward the front and ensure that handles turn in correct
direction.
Slide the mounting washers (C) through faucet inlet (B). •
Thread and hand tighten the mounting nut (D) through faucet inlet (B). •
Make sure both side of mounting nuts (D) are securely tightened.
Connect the faucet inlet (B) to inlet supply lines (E). Then connect the •
supply stop (F) to the inlet supply lines (E) (left is hot water supply
and right is cold water supply). Make sure inlet supply lines (E) are
securely tighten. Do not over tighten.
Turn on water. Check for any leaks. Make sure all the connections are •
secure.
Remove aerator. Open the handle.•
Flushandallowwatertorunatfullowforatleastoneminute.•
Replace aerator.•