Top Side Installation Manual

IN2019-1-PC/US
US Installation instructions
Top Side
PITT
®
cooking systems
209 River Road Extension
Cos Cob, CT 06807
T-203 900 1124
F-203 698 9425
info@pittcookingsystems.com
www.pittcookingsystems.com
PITT
®
cooking systems is a subsidiary of PCS USA LLC
1. Determine the dimensions of the cabinet and cut the support
beams with the saw. ATTENTION! Correct length of the beam =
the dimension of cabinet on the inside - 5/32 in (4 mm).
2. Place the inserts into the ends of the beams that have been
cut to size.
3. Place the beams between the cabinet and position it against
the under side of the PITT
®
cooking unit. ATTENTION: FOR THE
POSITIONING, SEE STEP 4.
4. Position the beams in such a way that the screws, gas
connection and the electricity block are freely accessible.
*
*
* Minimum distance of 3 5/32 in (80 mm)
5. Push the beams firmly against the underside of the PITT
®
cooking unit and tighten the lower two screws by hand. Repeat
this step for the other side of the cabinet.
6. Push the beams firmly against the underside of the PITT
®
cooking unit and tighten the upper two screws completely.
Then, tighten the lower screws completely.
Contents of package: Tools needed:
Measuring tape
Cross-point screwdriver
Metallic saw
2x support beams
4x inserts
16x cross-point screws 4,2x16 mm
Instructions for installation of support set
Installation TS 2019 US PC 1.indd 1-2 27-3-2019 09:15:27

Summary of content (2 pages)