Installation and Handling Instructions

3e. Apply aluminium tape and thermo tape in the recess(es), in this order:
1) aluminum tape 2) thermo tape 3) aluminum tape (fig. 13).
The aluminum and thermo tape should be overlapping the top of the worktop surface with at least
5 mm. This seal will offer protection to the changes in temperature.
Aluminum tape
Thermo tape
Aluminum tape
Note!
Tape may not be folded on edge of recess.
Heat conductor
Fig. 13
It is very important that this sealing does not stick out - this because the heat conductor
should be able to connect 100% with the bottom of the worktop.
!
3.
Manufacturing recesses (cut-outs) | Solid Surface
7