Instructions / Assembly

Pittsburgh Corning Glass Block Shower System Mortar Installation
Standard Fit Shower Instructions
5/12/08 1
1. Shower Base and Wall Preparation
1.1 After installation of the shower base, line base with paper or cardboard to
protect during installation of the glass blocks. Measure 2 ½ inches out from the
inside of the curb and draw a centerline the length of the curb.
1.2 On the side of the shower where you intend to install the glass blocks, use a
4-foot level to draw a plumb line on the wall starting at the centerline on the curb
and extending 76 inches up the wall. This will be your panel anchor line.
1.3 On the opposite wall use a 4-foot level to draw a plumb line on the wall
starting at the centerline on the curb and extending 65 inches up the wall. This
will be your centerline for the shower door.
2. PREPARATION OF VeriTru® SPACERS
2.1 Materials Required: one bag of VeriTru® Spacers, a file, tin snips and Mortar
1 & Mortar 2 System with VeriTru® Spacer Assembly Instructions. Follow
Assembly instructions section 4. Preparation, to make “L” and “T” spacers. Flat
spacers; clip off smooth legs of regular spacer and file off any burrs. These
spacers will be used between the EndBlock® Finishing Units.
2.2 Modified flat spacer: make a flat spacer and only cut one tab even with the
toothed leg. This spacer is used under the EndBlock® Finishing Unit.
Modified “L” spacer: make an “L” spacer but do not cut the bottom of the tab on
one side.
Modified “T” spacer: make a “T” spacer but do not cut the bottom of the tab on
one side.

Summary of content (5 pages)