Instructions / Assembly

36"
1
1
/4"
6" x 8" Premiere Series
6" x 8" ARQUE
®
Block
PLAN VIEW
18
5
/16"
24" Approx.
Opening
9
1
/2"
25"
72"
51"48"
6" x 8" EndBlock
Finishing Unit
6" x 8" Premiere Series
5
3
/4"
1
1
/4"
6" x 8" EndBlock
Finishing Unit
WALK-IN SHOWER SYSTEM KIT MATERIALS LIST
1 – Walk In Shower Base, 72 inch x 51 inch
110 – 6 inch x 8 inch x 4 inch Glass Blocks
30 – 6 inch x 8 inch x 4 inch ARQUE
®
Block
20 – 6 inch x 8 inch x 4 inch EndBlock
Finishing Unit
1 – ProVantage
Walk In Spacer Pack which includes the following:
30
pcs. ARQUE
®
Horizontal Spacers
(27 whole spacers and 3 half spacers)
40
pcs. ARQUE
®
Vertical Spacers
10
pcs. 4
7
/
8
inch Horizontal Spacers cut to fit
6 inch x 8 inch EndBlock
shape
120
pcs. 7
1
/
2
inch Vertical Spacers
10
pcs. 23
3
/
8
inch Horizontal Spacers
10
pcs. 46
1
/
4
inch Horizontal Spacers cut to fit
6 inch x 8 inch EndBlock
shape
4
pkgs. Anchor Packs
2 – Buckets ProVantage
Glass Block Surface Grout
1 – Chrome Shower Drain
24 – Tubes Pittsburgh Corning Glass Block Sealant
1 – Bottle TGR Grout Sealer
Installation Instructions
WALK-IN SHOWER FLOOR PLAN
(Right or left entry available. Right entry shown above.)
Pittsburgh Corning Glass Block Shower System ProVantage
Installation Instructions
TOOLS REQUIRED
» Screw driver, power drill with an
1
/
8
inch and a
3
/
16
inch drill bit,
3
/
16
inch masonry drill bit, long nose pliers, rubber mallet, four-foot level, caulk gun, utility knife,
margin trowel, rubber float, bucket, tile/grout sponge, rubber gloves, cheese cloth and safety glasses.
» To set and install the shower base you will also need a mortar pan, mortar mixer hoe, brick trowel, wood shims, galvanized nails, 50 lb. bag of plaster or mortar
and a sheet of roofing paper or plastic the size of the shower base.
Continued to next page »
ProVantage
Vertical Spacer
ProVantage
Anchor
ProVantage
ARQUE
®
Spacer
ProVantage
Horizontal Spacer