2.5 Next, apply four
1
/
2
inch dabs of sealant to the first vertical spacer
1
/
2
inch in from the four corners. Press the spacer into place over the anchor. Apply 4 dabs of
sealant to the other side of the first vertical spacer.
2.6 Apply
1
/
2
inch beads of sealant to the row of glass blocks behind the raised edge of the glass block faces on both sides of the blocks. Next, install first block on
top of the horizontal spacer with the beads of sealant down, push the block firmly against the wall and the base.
2. GLASS BLOCK INSTALLATION
(Straight wall section - Continued)
-4-
2.3 If the finishing unit doesn’t fit firmly on the horizontal spacer trim the end of the horizontal spacer. Carefully remove the glass blocks and vertical spacers from the
bottom horizontal spacer. Trace the outline of the horizontal spacer on the curb.
2.4 Now! Let’s build the wall. Apply
1
/
2
inch beads of sealant on top of the curb
1
/
2
inch inside the lines on both sides where the horizontal spacer was positioned. Then
reinstall the horizontal spacer, pressing it down into the sealant. (Do not secure with screws)