Manual
THE GEO2 TRIGGER 
ASSEMBLY
Remove the screws from the Geo2 frame that hold the 
bearing carrier in place in the top of the frame SEE FIGURE 
14.1
. Gently lift the bearing carrier and trigger assembly 
free from the frame taking care not to damage the micro-
switch or the Opto sensors SEE FIGURE 14.2.
Using a 1/16” hex key, loosen the trigger pin retaining set 
screw from the bottom of the trigger SEE FIGURE 14.3. 
Use a small hex key to push the trigger pin out of the 
bearing carrier from one side SEE FIGURE 14.4.
Clean the trigger and bearing carrier thoroughly and also 
clean the space within the frame that the trigger sits into.
Carefully remove the trigger spring from the spring hole 
in the top of the trigger and clean o any paint debris or 
moisture from it SEE FIGURE 14.5.
FIG 14.2
FIG 14.3
FIG 14.1
FIG 14.4
FIG 14.5
WARNING: DEGAS YOUR MARKER, DISCHARGING ANY 
STORED GAS IN A SAFE DIRECTION, AND REMOVE THE 
BARREL, LOADER, AIR SYSTEM AND ANY PAINTBALLS TO 
MAKE THE MARKER EASIER AND SAFER TO WORK ON.
CONTENTS
ORIENTAT ION
QUICK SET-UP
USING YOUR GEO2
ADVANCED SET-UP
MENU TREE
MAINTENANCE
FAULT FINDING
SERVICE CENTRES
PARTS LIST
SPARES & ACCESSORIES
E-PORTAL
INDEX
61.
mAINTENANCE
MAINTENANCE
QUICK GUIDE










